As the San Francisco Municipal Transportation Agency evolves, flexibility in technology and scope is one of the major design considerations to meet the needs of its users. The facility is designed to accommodate future expansion with minimal disruption. We worked with the system integrator to develop a phasing plan for migration and cut-over of existing systems to ensure continuity of service during the organization’s move-in process.
With an engineering team, we assisted SFMTA to design a 40,000-SF state-of-the-art transit management center capable of supporting current and future needs for a 30-year projection. Scope included programming and master planning to bring together the various mechanical aspects of operations to consolidate them into one center. By bringing these systems together, it streamlines the SFMTA’s operational team and transportation management.